Chines Completed Continuing On Sheers

Sunday, January 24, 2016

The last two weeks have been mostly about fitting longitudinal pieces, namely the remaining work on the port side chine and more work on the port side sheer (first lamination).The chine didnt disappoint me. It was every bit as difficult to get into position as the first one was. The difficulty was compounded by the lack of space on the port side of the boat. But after working it for several days,

Related Posts by Categories

0 comments:

Post a Comment

Note: Only a member of this blog may post a comment.

Copyright © 2014 Build a Boat from Plans | Powered By Blogger